Vladimir Fitsak

PhD    /    страна не указана

Коллеги:

Пользователь не указал коллег в данное время

Контактная информация  

Пожалуйста, напишите здесь информацию о себе

Публикации

Impact of mining depth on unit capacity

Fitsak V. V., Lomakina E. S., Strakhova A. A.
Based on the selected options of room-and-pillar systems, there are distinguished the main criteria and technical-and-economic indices having an impact on the rationality of mining systems’ use when decreasing the depth of room work conductance.

Determination of room-and-pillar system parameters for transition to greater depths

Fitsak V. V., Strakhova A. A., Chernobai V. I., Lomakina E. S.
With progress in depth, the most effective way to increase the field of application of room and pillar system is the transition to the combined support of the ore-concrete-ore or concreteore-concrete methods. With this arrangement, treatment of mine workings along the strike of the ore body...

Basics of Mathematical Field Theory in Relation to Geophysical Fields in Development of Systematic Nature o f Applied Physical Reasoning

Lomakina E. S., Fitsak V. V.
The relevance of the problem is conditioned by the need to change the extensive way of education development. It is impossible to increase the base of specific knowledge indefinitely. Today, something else is required: modern and intellectual education. The article is aimed at finding the way for...
другие публикации »